Fieldwood Energy (FWE) operates the Troika Subsea Production System (SPS). The system was (and still is) fit for purpose, but the topside controls are antiquated by existing technologies and non-upgradeable due to lack of vendor obsolescence planning. The presentation will discuss the addition of two additional subsea wells to the Troika SPS, while leveraging existing infrastructure in the area as a key to maintaining low cost.