Name
Session 4: Advancing Subsea – BP Manuel Electrical Heat Traced Flowline
Date & Time
Thursday, February 20, 2020, 8:30 AM - 9:00 AM
Paul Stern
Description
The BP Manuel development is a two well tie back to the Na Kika facility in Mississippi Canyon 474 in the Gulf of Mexico. The Manuel development began as a HIPPS tie in to an existing oil loop in the Na Kika subsea infrastructure; however, HIPPS proved to be a complex solution requiring replacement of two flex joints. Additionally, the HIPPS development scenario did not have a robust flow assurance strategy for a single line tie in that was suited for both early and late life.
Location Name
Room 221
Session Topic
Offshore Construction and Installation Techniques