The Horn Mountain Facility, located in GOA Mississippi Canyon, is a critical production hub for Occidental. To boost production from the existing subsea tiebacks Occidental installed and commissioned two separate artificial lift technologies in the same year using a bundled subsea installation campaign. One project implemented Down Hole Gas Lift to each well of the Horn Mountain West Tieback while the other rerouted the Horn Mountain Deep Tieback to ESPs installed in Caissons drilled over a half mile below the mudline. The Caisson ESP project is the first brownfield application of this technology in GOA and improves upon the Perdido Caisson design by setting the pumps much deeper to allow for better gas separation and increase pump suction pressure. These projects have significantly increased production, will increase Ultimate Recovery, and extend the life of the Horn Mountain Tiebacks.