Deepwater FPSO developments face significant schedule and execution risk during steel riser hook up, often driving long critical paths and extended offshore campaigns. Conventional flexible joint–based hang off systems require complex offshore operations, including divers or remotely applied tooling (RAT), increasing installation duration, vessel days, and safety exposure. These challenges can erode the FPSO advantage of accelerated time to first oil. ExxonMobil, in collaboration with Hunting Energy Services, developed and deployed a Titanium Stress Joint (TSJ)–based steel riser hang off system compatible with wet parking and direct pull through installation for spread moored FPSOs in the recent Yellowtail project in 2025. Although TSJs have been widely used in offshore applications for decades, their application as FPSO steel riser hang off systems has been limited. The system was designed to enable steel lazy wave risers to be offshore fabricated and wet parked independently of FPSO readiness off critical path, then directly pulled through and secured during final hook up without divers or RAT intervention in a rapid manner (3~4hrs of TSJ direct pull-through vs more than 12hrs of conventional flexible joint installation with RAT) with enhanced execution certainty. This presentation will provide an overview of ExxonMobil’s experience and lessons learned with TSJ based hang-off system design, fabrication, wet park and direct pull-in of TSJs on an FPSO.
900 E Market St
San Antonio, TX 78205
United States