Name
PLET Walking Recovery: Rapid Integrity Response, Synthetic Holdback Repair, and Production Restoration
Date & Time
Thursday, February 18, 2027, 8:00 AM - 8:30 AM
Ryan Meyer
Description


A routine ROV subsea inspection identified a failed holdback chain master link, which allowed the PLET to walk toward the host and overstress the connected production and gas lift jumpers. The event required immediate shut-in, integrity assessment, regulatory engagement, and rapid development of a subsea recovery strategy.

This presentation will describe the integrated response from initial discovery through production restoration, highlighting the technical decision-making used to secure the system, evaluate jumper and connector integrity, and select an executable repair path. Key topics include ROV inspection and LIDAR metrology, jumper stress assessment, master link recovery and failure analysis, and the use of an Endless Sling configuration as the installed holdback chain repair solution.

The recovery demonstrates how disciplined integrity management, rapid cross-functional collaboration, and practical subsea intervention planning can convert a high-consequence production and integrity threat into a controlled recovery.
 

Location Name
221
Full Address
Henry B. Gonzalez Convention Center
900 E Market St
San Antonio, TX 78205
United States
Session Type
Session 4