Name
Brownfield Project Execution: Addition of a SS Multiphase Pump System in the Shenzi Field, US GoM
Date & Time
Thursday, March 2, 2023, 8:00 AM - 8:30 AM
Lee Henley
Description

This presentation will provide an overview of the design, procurement, installation, and HUC of a (3.8 KW / 5,000 Hp) multiphase subsea pump system that was recently installed in the Woodside Energy Shenzi field in the US GoM. Performance metrics and operational benefits will be discussed.

Location Name
Moody Ballroom